Scale & transition
Ask for exact height, setbacks, building separation, massing and how a seven-storey form transitions to adjoining lower-rise homes.
LOCAL VOICES • GOOD PLANNING • MORE HOMES DONE WELL
Major housing projects can deliver urgently needed homes while also raising legitimate questions about height, density, traffic, privacy, trees, infrastructure and neighbourhood character. Protect Maroubra helps residents understand proposals and make their own informed submissions.
Independent community website. Not affiliated with Homes NSW, Randwick City Council or the NSW Government.
WHY THIS MATTERS
NSW planning rules provide State Significant Development pathways for certain large housing proposals, including government housing projects over 75 homes. SSD applications are assessed at state level rather than as an ordinary local development application.
Separate Housing SEPP provisions can also provide height and floor-space bonuses in qualifying affordable-housing developments. These rules do not mean every local control is automatically discarded: the applicable controls and any proposed variations need to be identified and assessed for each project.
How should Maroubra accommodate more housing while protecting reasonable standards for design, amenity, infrastructure, open space, trees, traffic and the relationship between new buildings and existing homes?
CASE STUDY
Homes NSW currently describes a seven-storey building of around 84 social homes on a 3,440 m² site, with shared outdoor space, a community room, bicycle storage and around 47 basement parking spaces. The project has not yet reached the SSDA exhibition stage; Homes NSW says an application is expected in late 2026.
Ask for exact height, setbacks, building separation, massing and how a seven-storey form transitions to adjoining lower-rise homes.
Request view-line diagrams, overlooking controls and verified shadow studies for neighbouring homes and private open space.
Ask how resident, visitor, service and construction traffic will be managed and how parking assumptions reflect local conditions.
Seek clear figures for tree retention/removal, deep-soil area, canopy targets, communal open space and replacement planting.
Ask for evidence on transport, drainage, waste, schools, health and community services, including cumulative impacts from nearby projects.
Ask how hazardous materials, unassessed subsurface areas, dust, noise, waste and unexpected contamination will be controlled during demolition.
ASK FOR EVIDENCE
What controls apply to this site now? Which height, FSR, setback or other standards does the proposal meet, exceed or seek to vary, and under what statutory provision?
What lower-scale design options were tested? Could the same housing objective be delivered with different massing, setbacks, dwelling mix or site planning?
How has the assessment accounted for other approved, proposed and under-construction housing projects in the immediate area?
What are the quantified impacts on solar access, privacy, outlook, noise, wind and visual bulk for the closest existing homes?
What evidence supports the proposed parking provision, and what are the expected effects on Yorktown Parade, Fitzgerald Avenue and event-day conditions near Coral Sea Park?
What controls, monitoring, complaints process and stop-work triggers will apply for asbestos, hazardous materials, dust, vibration, soil contamination and unexpected finds?
PARTICIPATE
Use specific, first-hand impacts where possible. Refer to documents, measurements or photographs. Explain the change you want considered. Avoid form-letter wording when you can: a personal, evidence-based submission is clearer.
Homes NSW says pre-application feedback on 8–30 Yorktown Parade is open until 7 October 2026.
Email Homes NSWCommunity Engagement: 1800 738 718
Formal SSD submissions must be lodged through the Major Projects portal during public exhibition.
NSW Planning PortalRandwick City Council is not the SSD consent authority, but council feedback can form part of the state assessment process.
Randwick City CouncilSUBMISSION BUILDER
Select only the issues that genuinely concern you. Add your own observations. Nothing you type is uploaded or stored by this page.
Review and edit the draft so it accurately reflects your own position. A formal SSD submission can only be lodged during exhibition through the NSW Planning Portal.
CHECK THE SOURCE
Information checked 22 September 2026. Project details can change; verify against official sources before submitting.